Milestones
• Site layout and elevation verification • Pool excavation and spoil removal • Initial inspection (where required)
• Rebar installation per engineered plans • Bond beam, steps, benches, and features formed • Bonding grid installed and inspected
• Suction and return plumbing installed • Pressure testing of plumbing lines • Electrical conduit, grounding, and bonding completed • Rough-in inspections completed
• Structural shell application • Beam, walls, and floor formed to specifications • Curing period initiated
• Waterline tile installation • Coping installed and set • Decking interface and expansion joints prepared
• Pumps, filters, heaters, automation, and sanitation installed • Gas, electrical, and plumbing connections completed • Initial system checks
• Surface preparation • Interior finish installed (plaster, pebble, quartz, etc.) • Fill initiated under controlled conditions
• Equipment startup and calibration • Water chemistry balancing • Final inspections completed • Client orientation and turnover