Milestones
01
Layout & Excavation
• Site layout and elevation
verification
• Pool excavation and spoil
removal
• Initial inspection (where
required)
02
Structural Steel & Bonding
• Rebar installation per
engineered plans
• Bond beam, steps, benches,
and features formed
• Bonding grid installed and
inspected
03
Plumbing & Electrical Rough-in
• Suction and return plumbing
installed
• Pressure testing of plumbing
lines
• Electrical conduit, grounding,
and bonding completed
• Rough-in inspections completed
01
Layout & Excavation
• Site layout and elevation
verification
• Pool excavation and spoil
removal
• Initial inspection (where
required)
02
Structural Steel & Bonding
• Rebar installation per
engineered plans
• Bond beam, steps, benches,
and features formed
• Bonding grid installed and
inspected
03
Plumbing & Electrical Rough-in
• Suction and return plumbing
installed
• Pressure testing of plumbing
lines
• Electrical conduit, grounding,
and bonding completed
• Rough-in inspections completed
04
Structural Shell (Gunite / Shotcrete)
• Structural shell application
• Beam, walls, and floor formed
to specifications
• Curing period initiated
05
Tile, Coping & Deck Interfaces
• Waterline tile installation
• Coping installed and set
• Decking interface and
expansion joints prepared
06
Equipment Set & Systems Installation
• Pumps, filters, heaters,
automation, and sanitation
installed
• Gas, electrical, and plumbing
connections completed
• Initial system checks
07
Interior Finish Application
• Surface preparation
• Interior finish installed (plaster,
pebble, quartz, etc.)
• Fill initiated under controlled
conditions
08
Startup, Commissioning & Final Inspections
• Equipment startup and calibration
• Water chemistry balancing
• Final inspections completed
• Client orientation and turnover
04
Structural Shell (Gunite / Shotcrete)
• Structural shell application
• Beam, walls, and floor formed
to specifications
• Curing period initiated
05
Tile, Coping & Deck Interfaces
• Waterline tile installation
• Coping installed and set
• Decking interface and
expansion joints prepared
06
Equipment Set & Systems Installation
• Pumps, filters, heaters,
automation, and sanitation
installed
• Gas, electrical, and plumbing
connections completed
• Initial system checks
07
Interior Finish Application
• Surface preparation
• Interior finish installed (plaster,
pebble, quartz, etc.)
• Fill initiated under controlled
conditions
08
Startup, Commissioning & Final Inspections
• Equipment startup and calibration
• Water chemistry balancing
• Final inspections completed
• Client orientation and turnover