Technical Construction Process

01

Site Evaluation & Scope Definition

Detailed site assessment including setbacks, elevations, access, utilities, and soil conditions. Project scope, specifications, and construction parameters are defined.

02

Design Development & Engineering

Custom pool design is developed with structural engineering, hydraulic planning, equipment selection, and code compliance to ensure performance and longevity.

03

Permitting & Pre-Construction Coordination

Construction documents are finalized, permits secured, schedules established, and subcontractor coordination completed prior to mobilization.

01

Site Evaluation & Scope Definition

Detailed site assessment including setbacks, elevations, access, utilities, and soil conditions. Project scope, specifications, and construction parameters are defined.

02

Design Development & Engineering

Custom pool design is developed with structural engineering, hydraulic planning, equipment selection, and code compliance to ensure performance and longevity.

03

Permitting & Pre-Construction Coordination

Construction documents are finalized, permits secured, schedules established, and subcontractor coordination completed prior to mobilization.

04

Structural Construction

Excavation, steel reinforcement, bonding, plumbing, electrical rough-in, and structural shell installation are completed under quality control standards.

05

Finishes, Equipment & Commissioning

Interior finishes, coping, tile, decking interfaces, equipment installation, system startup, and operational testing are completed.

06

Final Inspection & Turnover

Final inspections, client orientation, documentation, and warranty handoff are completed, followed by post-construction support.

04

Structural Construction

Excavation, steel reinforcement, bonding, plumbing, electrical rough-in, and structural shell installation are completed under quality control standards.

05

Finishes, Equipment & Commissioning

Interior finishes, coping, tile, decking interfaces, equipment installation, system startup, and operational testing are completed.

06

Final Inspection & Turnover

Final inspections, client orientation, documentation, and warranty handoff are completed, followed by post-construction support.